Home Articles posted by Admin (Page 3)
Project “IWRM: theory, practice and perspectives in the river basins of the Republic of Tajikistan”

Project “IWRM: theory, practice and perspectives in the river basins of the Republic of Tajikistan”

In the period from June 10-13 of this year, four trainings on “IWRM: theory, practice and prospects in the river basins of the Republic of Tajikistan” were organized and conducted. The training was conducted at each watershed of the Aksu-Isfana-Tomchasai-Khojabakirgan-Arkasai sub-basins. This means four trainings, one at each watershed. During the training, participants were selected […]

Read More
Experts determine the place of construction of joint Tajik-Uzbek hydroelectric power plants on the Zarafshan River

Experts determine the place of construction of joint Tajik-Uzbek hydroelectric power plants on the Zarafshan River

A joint Tajik-Uzbek working group is engaged in determining the site for the construction of two hydroelectric power plants (HPP) on the Zarafshan River, the joint construction of which was agreed by the presidents of Tajikistan and Uzbekistan Emomali Rahmon and Shavkat Mirziyoyev last year. “After the decision was made by the heads of the […]

Read More
Participation in the ceremony of the implementation of the project for the restoration and reconstruction of the water supply network of the city of Guliston

Participation in the ceremony of the implementation of the project for the restoration and reconstruction of the water supply network of the city of Guliston

On the fourth day of his working trip to the cities and districts of the Sughd region, the Founder of Peace and National Unity – Leader of the Nation, President of the Republic of Tajikistan, esteemed Emomali Rahmon in the city of Guliston, took part in the ceremony of implementing the project for the restoration […]

Read More
Nurek reservoir filled “to the full”

Nurek reservoir filled “to the full”

The maximum level of filling of the Nurek HPP reservoir was reached at the end of August this year. At the end of August 2018, the water level in the reservoir of the Nurek HPP was 910.45 m, says the report “Monitoring and Earlier Alert in Tajikistan, prepared by the Ministry of Economic Development and […]

Read More
Final training on IWRM and basin planning

Final training on IWRM and basin planning

The State Enterprise “TajikNIIGiM” of the Ministry of Energy and Water Resources of the Republic of Tajikistan, with the support of the Swiss organization HELVETAS SWISS COOPERATION, and the German Society for International Cooperation (GIZ) in February and May 2018, conducted a series of training sessions on “IWRM and Basin Planning”. The purpose of this […]

Read More
Training on “IWRM and Basin Planning”

Training on “IWRM and Basin Planning”

From 20 to 22 February 2018 in the city of Buston, Sughd region, the Training on “IWRM and Basin Planning” was held, which was dedicated to the International Decade of Action “Water for Sustainable Development” 2018-2028 and the Water Sector Reform Program for 2016-2025). The main goals and objectives of IWRM were: Familiarization of students […]

Read More